Planning Legislation (Fee Unit Conversion and Other Amounts) Amendment Regulation 2022


Queensland Crest

Part 1 Preliminary

1Short title

This regulation may be cited as the Planning Legislation (Fee Unit Conversion and Other Amounts) Amendment Regulation 2022.

2Commencement

Section 15 commences on 1 July 2022.

Part 2 Amendment of Planning Regulation 2017

3Regulation amended

This part amends the Planning Regulation 2017.

4Amendment of s 33 (Required fee for development applications—Act, s 51)

Section 33(1)(b), example, ‘$24,004.00’—
omit, insert—

24,004 fee units

5Amendment of s 34 (Required fee for referral agency’s assessment—Act, s 54)

Section 34(1)(b), example, ‘$11,145.00’—
omit, insert—

11,145 fee units

6Amendment of s 35 (Fee for operational work for clearing native vegetation)

Section 35, ‘$13,715’—
omit, insert—

13,715 fee units

7Amendment of s 36 (Fee for operational work that is waterway barrier works)

Section 36, ‘$13,715’—
omit, insert—

13,715 fee units

8Amendment of s 36A (Fee for assessable development under sch 10, pt 16)

Section 36A(2), ‘$1,714’—
omit, insert—

1,714 fee units

9Amendment of s 37 (Fee for fast-track development)

Section 37, ‘$856’—
omit, insert—

856 fee units

10Amendment of s 38 (Required fee for registered non-profit organisations and government-funded community development)

(1)Section 38(2), example 1, ‘$13,715, is $6,858’—
omit, insert—

13,715 fee units, is 6,858 fee units

(2)Section 38(2), example 2, ‘$856, is $428’—
omit, insert—

856 fee units, is 428 fee units

11Insertion of new s 72A

After section 72
insert—

72ARounding of amounts expressed as numbers of fee units

(1)This section applies for working out the amount of a fee or charge expressed in this regulation as a number of fee units.
(2)For the purpose of the Acts Interpretation Act 1954, section 48C(3), the amount is to be rounded to the nearest dollar (rounding one-half upwards).

Example—

If a fee were 3500 fee units and the value of a fee unit were $1.015, the number of dollars obtained by multiplying 3500 by $1.015 would be $3,552.50. Because $3,552.50 is halfway between $3,552 and $3,553, it is rounded upwards, so the amount of the fee would be $3,553.

12Amendment of sch 9 (Building work under Building Act)

(1)Schedule 9, part 3, division 1, table 1, item 8(b), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(2)Schedule 9, part 3, division 1, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(3)Schedule 9, part 3, division 1, table 2, item 8(c)(i) and (d)(i), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(4)Schedule 9, part 3, division 1, table 2, item 8(c)(ii) and (d)(ii), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(5)Schedule 9, part 3, division 1, table 3, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(6)Schedule 9, part 3, division 1, table 4, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

13Amendment of sch 10 (Development assessment)

(1)Schedule 10, part 1, division 2, table 1, item 5, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(2)Schedule 10, part 3, division 3, table 1, item 5(a)(ii), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(3)Schedule 10, part 3, division 3, table 1, item 5(b), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(4)Schedule 10, part 3, division 3, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(5)Schedule 10, part 3, division 4, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(6)Schedule 10, part 3, division 4, table 2, item 8(c), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(7)Schedule 10, part 3, division 4, table 2, item 8(d), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(8)Schedule 10, part 3, division 4, table 3, item 8(a), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(9)Schedule 10, part 3, division 4, table 3, item 8(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(10)Schedule 10, part 4, division 3, table 1, item 8, column 2, ‘$856.00’—
omit, insert—

856 fee units

(11)Schedule 10, part 5, division 3, table 1, item 5(a) and (b)(ii), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(12)Schedule 10, part 5, division 3, table 1, item 5(b)(i), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(13)Schedule 10, part 5, division 3, table 1, item 5(b)(iii), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(14)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(a) and (e), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(15)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(b) and (f), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(16)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(c), (d) and (g), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(17)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(a), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(18)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(b)(i) and (c)(i), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(19)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(b)(ii) and (c)(ii), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(20)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(a), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(21)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(22)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(23)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(a), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(24)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(25)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(c), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(26)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(a) and (d), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(27)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(28)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(29)Schedule 10, part 7, division 2, table 1, item 5, column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(30)Schedule 10, part 7, division 3, table 1, item 8, column 2, ‘$856.00’—
omit, insert—

856 fee units

(31)Schedule 10, part 8, division 2, subdivision 2, table 1, item 5(c), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(32)Schedule 10, part 8, division 2, subdivision 2, table 2, item 5(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(33)Schedule 10, part 9, division 1, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(34)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(a)(i) and (b)(ii), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(35)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(a)(ii), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(36)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(b)(i), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(37)Schedule 10, part 9, division 4, subdivision 2, table 1, entry for item 8—
omit, insert—

8  Fee for referral—

(a)  if the reconfiguration results in less than 50 lots

1,714 fee units + (856 fee units x S)

where—

S means the number of State transport corridors that all or part of the premises are within 25m of, minus 1

Example—

For premises within 25m of 3 State transport corridors, the fee is 1,714 fee units + (856 fee units x 2) = 3,426 fee units.

(b)  if the reconfiguration results in 50 lots or more, but no more than 200 lots

3,430 fee units + (1,714 fee units x S)

where—

S means the number of State transport corridors that all or part of the premises are within 25m of, minus 1

Example—

For premises within 25m of 3 State transport corridors, the fee is 3,430 fee units + (1,714 fee units x 2) = 6,858 fee units.

(c)  if the reconfiguration results in more than 200 lots

6,859 fee units + (3,430 fee units x S)

where—

 

S means the number of State transport corridors that all or part of the premises are within 25m of, minus 1

 

Example—

For premises within 25m of 3 State transport corridors, the fee is 6,859 fee units + (3,430 fee units x 2) = 13,719 fee units.

(38)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(a), column 2, ‘$856.00’—
omit, insert—

856 fee units

(39)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(40)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(c), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(41)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(b), column 2, ‘$856.00’—
omit, insert—

856 fee units

(42)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(c), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(43)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(d), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(44)Schedule 10, part 9, division 4, subdivision 2, table 4, entry for item 8—
omit, insert—

8  Fee for referral—

(a)  if the material change of use involves reconfiguring a lot stated in table 1, item 1, column 2, table 2, item 1, column 2 or table 3, item 1, column 2

Nil

(b)  if paragraph (a) does not apply and the material change of use is stated in item 1, column 2, paragraph (a) and does not involve new relevant vehicular access to a State transport corridor—
 

(i)  for premises that consist of at least 1 dwelling but no more than 4 dwellings

856 fee units for each State transport corridor that all or part of the premises is within 25m of

(ii)  otherwise

1,714 fee units + (856 fee units x S)

where—

S means the number of State transport corridors that all or part of the premises is within 25m of, minus 1

Example—

For premises within 25m of 3 State transport corridors, the fee is 1,714 fee units + (856 fee units x 2) = 3,426 fee units.

(c)  if paragraph (a) does not apply and the material change of use is stated in item 1, column 2, paragraph (c) and does not involve new relevant vehicular access to a State transport corridor—
 

(i)  for premises that consist of at least 1 dwelling but no more than 4 dwellings

856 fee units

(ii)  otherwise

1,714 fee units

(d)  if paragraph (a) does not apply and the material change of use is stated in item 1, column 2, paragraph (a) or (c) and involves a new relevant vehicular access to a State transport corridor—
 

(i)  for premises that consist of at least 1 dwelling but no more than 4 dwellings

1,714 fee units + (856 fee units x S)

where—

S means the number of State transport corridors that all or part of the premises is within 25m of, minus 1

 

Example—

For premises within 25m of 3 State transport corridors, the fee is 1,714 fee units + (856 fee units x 2) = 3,426 fee units.

(ii)  otherwise

3,430 fee units + (1,714 fee units x S)

 

where—

 

S means the number of State transport corridors that all or part of the premises is within 25m of, minus 1

 

Example—

For premises within 25m of 3 State transport corridors, the fee is 3,430 fee units + (1,714 fee units x 2) = 6,858 fee units.

(e)  if paragraph (a) does not apply and all or part of the premises are a future State transport corridor—
 

(i)  for premises that consist of at least 1 dwelling but no more than 4 dwellings

856 fee units for each future State transport corridor

(ii)  otherwise

1,714 fee units for each future State transport corridor

(45)Schedule 10, part 9, division 4, subdivision 2, table 5, entry for item 8—
omit, insert—

8  Fee for referral

3,430 fee units + (1,714 fee units x S)

where—

S means the number of State transport corridors that all or part of the premises is within 25m of, minus 1Example—

For premises within 25m of 3 State transport corridors, the fee is 3,430 fee units + (1,714 fee units x 2) = 6,858 fee units.

(46)Schedule 10, part 9, division 4, subdivision 2, table 6, entry for item 8—
omit, insert—

8  Fee for referral

3,430 fee units + (1,714 fee units x F)

 

where—

 

F means the number of future State transport corridors on the premises, minus 1Example—

For premises that have 3 future State transport corridors on the premises, the fee is 3,430 fee units + (1,714 fee units x 2) = 6,858 fee units.

(47)Schedule 10, part 9, division 4, subdivision 3, table 1, item 8, column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(48)Schedule 10, part 9, division 4, subdivision 3, table 2, item 8(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(49)Schedule 10, part 9, division 4, subdivision 3, table 3, item 8, column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(50)Schedule 10, part 10, division 3, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(51)Schedule 10, part 10, division 4, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(52)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(a), column 2, ‘$10,000.00’—
omit, insert—

10,000 fee units

(53)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(b)(i), column 2, ‘$15,715.00’—
omit, insert—

15,715 fee units

(54)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(b)(ii), column 2, ‘$28,572.00’—
omit, insert—

28,572 fee units

(55)Schedule 10, part 15, division 1, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(56)Schedule 10, part 15, division 2, subdivision 3, table 1, item 8(b), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(57)Schedule 10, part 16, division 2, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(58)Schedule 10, part 16, division 3, subdivision 4, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(59)Schedule 10, part 16, division 4, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(60)Schedule 10, part 16, division 6, subdivision 4, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(61)Schedule 10, part 16, division 6, subdivision 4, table 2, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(62)Schedule 10, part 16, division 7, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(63)Schedule 10, part 17, division 2, table 1, item 5(a), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(64)Schedule 10, part 17, division 2, table 1, item 5(d), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(65)Schedule 10, part 17, division 3, table 1, item 8(a), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(66)Schedule 10, part 17, division 3, table 1, item 8(d), column 2, ‘$856.00’—
omit, insert—

856 fee units

(67)Schedule 10, part 17, division 3, table 1, item 8(e), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(68)Schedule 10, part 17, division 3, table 2, item 8(a), column 2, ‘$1,714.00’—
omit, insert—

1,714 fee units

(69)Schedule 10, part 17, division 3, table 2, item 8(b), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(70)Schedule 10, part 17, division 3, table 2, item 8(c), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(71)Schedule 10, part 17, division 3, table 5, item 8(a) and (b), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(72)Schedule 10, part 17, division 3, table 5, item 8(c), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(73)Schedule 10, part 17, division 3, table 6, item 8(b), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(74)Schedule 10, part 18, table 1, item 8, column 2, ‘$16,435.00’—
omit, insert—

16,435 fee units

(75)Schedule 10, part 19, division 1, subdivision 2, table 1, item 5(a), column 2, ‘$170.00’—
omit, insert—

170 fee units

(76)Schedule 10, part 19, division 1, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(77)Schedule 10, part 19, division 2, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(78)Schedule 10, part 19, division 2, subdivision 3, table 1, item 8(b), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(79)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(a), column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

(80)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(81)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(c), column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(82)Schedule 10, part 19, division 4, subdivision 3, table 1, item 8, column 2, ‘$6,859.00’—
omit, insert—

6,859 fee units

(83)Schedule 10, part 20, division 3, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(84)Schedule 10, part 20, division 4, table 2, item 8, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(85)Schedule 10, part 20, division 4, table 3, item 8, column 2, ‘$3,430.00’—
omit, insert—

3,430 fee units

(86)Schedule 10, part 21, division 2, table 1, item 5, column 2, ‘$13,715.00’—
omit, insert—

13,715 fee units

14Amendment of sch 15 (Required fee for particular change applications and extension applications)

(1)Schedule 15, items 1(a) and 3(b), column 3, ‘$856.00’—
omit, insert—

856 fee units

(2)Schedule 15, item 1(b), column 3, ‘$1,714.00’—
omit, insert—

1,714 fee units

(3)Schedule 15, item 3(a), column 3, ‘$428.00’—
omit, insert—

428 fee units

15Replacement of sch 16 (Prescribed amount)

Schedule 16—
omit, insert—

Schedule 16 Prescribed amount

section 52

Notes—

1This schedule was inserted by amending legislation that commenced on 1 July 2022.
2See also section 112(2) of the Act.

Table 1—Prescribed amount

Column 1

Column 2

Use

Prescribed amount

Residential uses

1  Dwelling house
2  Dual occupancy
3  Caretaker’s accommodation
4  Multiple dwelling

1  $22,200.00 for each dwelling with 2 or less bedrooms
2  $31,080.00 for each dwelling with 3 or more bedrooms

Accommodation (short-term)

1  Tourist park

1  If the tourist park has tent or caravan sites—
(a)  $11,099.95 for each group of 2 sites or less
(b)  $15,539.90 for each group of 3 sites
2  If the tourist park has cabins—
(a)  $11,099.95 for each cabin with 2 or less bedrooms
(b)  $15,539.90 for each cabin with 3 or more bedrooms

2  Hotel
3  Short-term accommodation
4  Resort complex

1  $11,099.95 for each suite with 2 or less bedrooms
2  $15,539.90 for each suite with 3 or more bedrooms
3  $11,099.95 for each bedroom that is not part of a suite

Accommodation (long-term)

1  Relocatable home park

1  $22,200.00 for each relocatable dwelling site for 2 or less bedrooms
2  $31,080.00 for each relocatable dwelling site for 3 or more bedrooms

2  Community residence
3  Retirement facility
4  Rooming accommodation

1  $22,200.00 for each suite with 2 or less bedrooms
2  $31,080.00 for each suite with 3 or more bedrooms
3  $22,200.00 for each bedroom that is not part of a suite

Places of assembly

1  Club
2  Community use
3  Function facility
4  Funeral parlour
5  Place of worship

1  $77.75 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Commercial (bulk goods)

1  Agricultural supplies store
2  Bulk landscape supplies
3  Garden centre
4  Hardware and trade supplies
5  Outdoor sales
6  Showroom

1  $155.40 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Commercial (retail)

1  Adult store
2  Food and drink outlet
3  Service industry
4  Service station
5  Shop
6  Shopping centre

1  $199.80 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Commercial (office)

1  Office
2  Sales office

1  $155.40 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Educational facility

1  Childcare centre
2  Community care centre
3  Educational establishment

1  $155.40 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Entertainment

1  Hotel
2  Nightclub entertainment facility
3  Theatre
4  Resort complex

1  $221.95 for each square metre of gross floor area, other than areas for providing accommodation
2  $11.10 for each square metre impervious to stormwater

Indoor sport and recreation

1  Indoor sport and recreation

1  $221.95 for each square metre of gross floor area, other than court areas
2  $22.15 for each square metre of gross floor area that is a court area
3  $11.10 for each square metre impervious to stormwater

High impact industry or special industry

1  High impact industry
2  Special industry

1  $77.75 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Other industry

1  Low impact industry
2  Medium impact industry
3  Research and technology industry
4  Rural industry
5  Warehouse
6  Marine industry

1  $55.50 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

High impact rural

1  Cultivating, in a confined area, aquatic animals or plants for sale
2  Intensive animal industry
3  Intensive horticulture
4  Wholesale nursery
5  Winery

1  $22.15 for each square metre of gross floor area

Low impact rural

1  Animal husbandry
2  Cropping
3  Permanent plantation
4  Wind farm

Nil

Essential services

1  Correctional facility
2  Emergency services
3  Health care service
4  Hospital
5  Residential care facility
6  Veterinary service

1  $155.40 for each square metre of gross floor area
2  $11.10 for each square metre impervious to stormwater

Minor uses

1  Advertising device
2  Cemetery
3  Home-based business
4  Landing
5  Market
6  Outdoor lighting
7  Park
8  Roadside stall
9  Telecommunications facility
10  Temporary use

Nil

Other uses

1  Air service
2  Animal keeping
3  Car park
4  Crematorium
5  Extractive industry
6  Major sport, recreation and entertainment facility
7  Motor sport facility
8  Outdoor sport and recreation
9  Port service
10  Tourist attraction
11  Utility installation
12  Workforce accommodation
13  Any other use not listed in column 1, including a use that is unknown

The prescribed amount for another similar use listed in column 1 (other than in this row) that the local government or distributor-retailer decides to apply to the use

16Amendment of sch 17 (Tribunal fees)

Schedule 17, column 3, heading, ‘$’—
omit, insert—

Fee units

17Regulation amended

This part amends the Regional Planning Interests Regulation 2014.

18Amendment of s 16 (Mitigation value)

Section 16(1)(a) to (e)—
omit, insert—
(a)for land in the following sub-zones in the Western Cropping zone—
(i)Balonne—5,752 fee units;
(ii)Central Highlands Isaac—5,576 fee units;
(iii)Goondiwindi—6,162 fee units;
(iv)Maranoa—6,749 fee units;
(v)Western Downs—7,042 fee units;
(b)for land in the Eastern Darling Downs zone—8,803 fee units;
(c)for land in the following sub-zones in the Coastal Queensland zone—
(i)Burdekin—13,205 fee units;
(ii)Burnett North and South—13,205 fee units;
(iii)Mackay Whitsunday—13,205 fee units;
(iv)Wide Bay Bundaberg—13,205 fee units;
(v)Central Queensland Coast—17,604 fee units;
(vi)South East Queensland—29,343 fee units;
(d)for land in the Granite Belt zone—16,431 fee units;
(e)for land in the Wet Tropics zone—23,475 fee units.

19Insertion of new s 19A

After section 19
insert—

19ARounding of amounts expressed as numbers of fee units

(1)This section applies for working out the amount of a fee expressed in this regulation as a number of fee units.
(2)For the purpose of the Acts Interpretation Act 1954, section 48C(3), the amount is to be rounded to the nearest dollar (rounding one-half upwards).

Example—

If a fee were 3500 fee units and the value of a fee unit were $1.015, the number of dollars obtained by multiplying 3500 by $1.015 would be $3,552.50. Because $3,552.50 is halfway between $3,552 and $3,553, it is rounded upwards, so the amount of the fee would be $3,553.

20Amendment of sch 4 (Assessment application fees)

(1)Schedule 4, part 1, section 1, heading, ‘sch 4’—
omit, insert—

schedule

(2)Schedule 4, parts 2 to 5, column 2, heading, after ‘Fee’—
insert—

units

(3)Schedule 4, parts 2 to 5, column 2, heading, ‘$’—
omit.