This regulation may be cited as the Planning Legislation (Fee Unit Conversion and Other Amounts) Amendment Regulation 2022.
Section 15 commences on 1 July 2022.
Part 2 Amendment of Planning Regulation 2017
This part amends the Planning Regulation 2017.
4Amendment of s 33 (Required fee for development applications—Act, s 51)
Section 33(1)(b), example, ‘$24,004.00’—
omit, insert—24,004 fee units
5Amendment of s 34 (Required fee for referral agency’s assessment—Act, s 54)
Section 34(1)(b), example, ‘$11,145.00’—
omit, insert—11,145 fee units
6Amendment of s 35 (Fee for operational work for clearing native vegetation)
Section 35, ‘$13,715’—
omit, insert—13,715 fee units
7Amendment of s 36 (Fee for operational work that is waterway barrier works)
Section 36, ‘$13,715’—
omit, insert—13,715 fee units
8Amendment of s 36A (Fee for assessable development under sch 10, pt 16)
Section 36A(2), ‘$1,714’—
omit, insert—1,714 fee units
9Amendment of s 37 (Fee for fast-track development)
Section 37, ‘$856’—
omit, insert—856 fee units
10Amendment of s 38 (Required fee for registered non-profit organisations and government-funded community development)
(1)Section 38(2), example 1, ‘$13,715, is $6,858’—
omit, insert—13,715 fee units, is 6,858 fee units
(2)Section 38(2), example 2, ‘$856, is $428’—
omit, insert—856 fee units, is 428 fee units
After section 72—
insert—72ARounding of amounts expressed as numbers of fee units
(1)This section applies for working out the amount of a fee or charge expressed in this regulation as a number of fee units.(2)For the purpose of the Acts Interpretation Act 1954, section 48C(3), the amount is to be rounded to the nearest dollar (rounding one-half upwards).If a fee were 3500 fee units and the value of a fee unit were $1.015, the number of dollars obtained by multiplying 3500 by $1.015 would be $3,552.50. Because $3,552.50 is halfway between $3,552 and $3,553, it is rounded upwards, so the amount of the fee would be $3,553.
12Amendment of sch 9 (Building work under Building Act)
(1)Schedule 9, part 3, division 1, table 1, item 8(b), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(2)Schedule 9, part 3, division 1, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(3)Schedule 9, part 3, division 1, table 2, item 8(c)(i) and (d)(i), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(4)Schedule 9, part 3, division 1, table 2, item 8(c)(ii) and (d)(ii), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(5)Schedule 9, part 3, division 1, table 3, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(6)Schedule 9, part 3, division 1, table 4, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
13Amendment of sch 10 (Development assessment)
(1)Schedule 10, part 1, division 2, table 1, item 5, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(2)Schedule 10, part 3, division 3, table 1, item 5(a)(ii), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(3)Schedule 10, part 3, division 3, table 1, item 5(b), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(4)Schedule 10, part 3, division 3, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(5)Schedule 10, part 3, division 4, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(6)Schedule 10, part 3, division 4, table 2, item 8(c), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(7)Schedule 10, part 3, division 4, table 2, item 8(d), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(8)Schedule 10, part 3, division 4, table 3, item 8(a), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(9)Schedule 10, part 3, division 4, table 3, item 8(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(10)Schedule 10, part 4, division 3, table 1, item 8, column 2, ‘$856.00’—
omit, insert—856 fee units
(11)Schedule 10, part 5, division 3, table 1, item 5(a) and (b)(ii), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(12)Schedule 10, part 5, division 3, table 1, item 5(b)(i), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(13)Schedule 10, part 5, division 3, table 1, item 5(b)(iii), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(14)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(a) and (e), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(15)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(b) and (f), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(16)Schedule 10, part 6, division 1, subdivision 2, table 1, item 5(c), (d) and (g), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(17)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(a), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(18)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(b)(i) and (c)(i), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(19)Schedule 10, part 6, division 2, subdivision 2, table 1, item 5(b)(ii) and (c)(ii), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(20)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(a), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(21)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(22)Schedule 10, part 6, division 3, subdivision 2, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(23)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(a), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(24)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(25)Schedule 10, part 6, division 3, subdivision 3, table 2, item 8(c), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(26)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(a) and (d), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(27)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(28)Schedule 10, part 6, division 4, subdivision 2, table 1, item 5(c), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(29)Schedule 10, part 7, division 2, table 1, item 5, column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(30)Schedule 10, part 7, division 3, table 1, item 8, column 2, ‘$856.00’—
omit, insert—856 fee units
(31)Schedule 10, part 8, division 2, subdivision 2, table 1, item 5(c), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(32)Schedule 10, part 8, division 2, subdivision 2, table 2, item 5(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(33)Schedule 10, part 9, division 1, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(34)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(a)(i) and (b)(ii), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(35)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(a)(ii), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(36)Schedule 10, part 9, division 4, subdivision 1, table 1, item 8(b)(i), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(37)Schedule 10, part 9, division 4, subdivision 2, table 1, entry for item 8—
omit, insert—(38)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(a), column 2, ‘$856.00’—
omit, insert—856 fee units
(39)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(40)Schedule 10, part 9, division 4, subdivision 2, table 2, item 8(c), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(41)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(b), column 2, ‘$856.00’—
omit, insert—856 fee units
(42)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(c), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(43)Schedule 10, part 9, division 4, subdivision 2, table 3, item 8(d), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(44)Schedule 10, part 9, division 4, subdivision 2, table 4, entry for item 8—
omit, insert—(45)Schedule 10, part 9, division 4, subdivision 2, table 5, entry for item 8—
omit, insert—(46)Schedule 10, part 9, division 4, subdivision 2, table 6, entry for item 8—
omit, insert—(47)Schedule 10, part 9, division 4, subdivision 3, table 1, item 8, column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(48)Schedule 10, part 9, division 4, subdivision 3, table 2, item 8(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(49)Schedule 10, part 9, division 4, subdivision 3, table 3, item 8, column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(50)Schedule 10, part 10, division 3, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(51)Schedule 10, part 10, division 4, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(52)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(a), column 2, ‘$10,000.00’—
omit, insert—10,000 fee units
(53)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(b)(i), column 2, ‘$15,715.00’—
omit, insert—15,715 fee units
(54)Schedule 10, part 13, division 1, subdivision 1, table 1, item 5(b)(ii), column 2, ‘$28,572.00’—
omit, insert—28,572 fee units
(55)Schedule 10, part 15, division 1, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(56)Schedule 10, part 15, division 2, subdivision 3, table 1, item 8(b), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(57)Schedule 10, part 16, division 2, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(58)Schedule 10, part 16, division 3, subdivision 4, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(59)Schedule 10, part 16, division 4, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(60)Schedule 10, part 16, division 6, subdivision 4, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(61)Schedule 10, part 16, division 6, subdivision 4, table 2, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(62)Schedule 10, part 16, division 7, subdivision 3, table 1, item 8, column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(63)Schedule 10, part 17, division 2, table 1, item 5(a), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(64)Schedule 10, part 17, division 2, table 1, item 5(d), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(65)Schedule 10, part 17, division 3, table 1, item 8(a), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(66)Schedule 10, part 17, division 3, table 1, item 8(d), column 2, ‘$856.00’—
omit, insert—856 fee units
(67)Schedule 10, part 17, division 3, table 1, item 8(e), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(68)Schedule 10, part 17, division 3, table 2, item 8(a), column 2, ‘$1,714.00’—
omit, insert—1,714 fee units
(69)Schedule 10, part 17, division 3, table 2, item 8(b), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(70)Schedule 10, part 17, division 3, table 2, item 8(c), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(71)Schedule 10, part 17, division 3, table 5, item 8(a) and (b), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(72)Schedule 10, part 17, division 3, table 5, item 8(c), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(73)Schedule 10, part 17, division 3, table 6, item 8(b), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(74)Schedule 10, part 18, table 1, item 8, column 2, ‘$16,435.00’—
omit, insert—16,435 fee units
(75)Schedule 10, part 19, division 1, subdivision 2, table 1, item 5(a), column 2, ‘$170.00’—
omit, insert—170 fee units
(76)Schedule 10, part 19, division 1, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(77)Schedule 10, part 19, division 2, subdivision 2, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(78)Schedule 10, part 19, division 2, subdivision 3, table 1, item 8(b), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(79)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(a), column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
(80)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(b), column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(81)Schedule 10, part 19, division 3, subdivision 2, table 1, item 5(c), column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(82)Schedule 10, part 19, division 4, subdivision 3, table 1, item 8, column 2, ‘$6,859.00’—
omit, insert—6,859 fee units
(83)Schedule 10, part 20, division 3, table 1, item 5, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(84)Schedule 10, part 20, division 4, table 2, item 8, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(85)Schedule 10, part 20, division 4, table 3, item 8, column 2, ‘$3,430.00’—
omit, insert—3,430 fee units
(86)Schedule 10, part 21, division 2, table 1, item 5, column 2, ‘$13,715.00’—
omit, insert—13,715 fee units
14Amendment of sch 15 (Required fee for particular change applications and extension applications)
(1)Schedule 15, items 1(a) and 3(b), column 3, ‘$856.00’—
omit, insert—856 fee units
(2)Schedule 15, item 1(b), column 3, ‘$1,714.00’—
omit, insert—1,714 fee units
(3)Schedule 15, item 3(a), column 3, ‘$428.00’—
omit, insert—428 fee units
15Replacement of sch 16 (Prescribed amount)
Schedule 16—
omit, insert—section 52
1This schedule was inserted by amending legislation that commenced on 1 July 2022.2See also section 112(2) of the Act.
Table 1—Prescribed amount
Column 1
Column 2
Use
Prescribed amount
Residential uses
1 Dwelling house2 Dual occupancy3 Caretaker’s accommodation4 Multiple dwelling 1 $22,200.00 for each dwelling with 2 or less bedrooms2 $31,080.00 for each dwelling with 3 or more bedroomsAccommodation (short-term)
1 Tourist park 1 If the tourist park has tent or caravan sites—(a) $11,099.95 for each group of 2 sites or less(b) $15,539.90 for each group of 3 sites2 If the tourist park has cabins—(a) $11,099.95 for each cabin with 2 or less bedrooms(b) $15,539.90 for each cabin with 3 or more bedrooms 2 Hotel3 Short-term accommodation4 Resort complex 1 $11,099.95 for each suite with 2 or less bedrooms2 $15,539.90 for each suite with 3 or more bedrooms3 $11,099.95 for each bedroom that is not part of a suiteAccommodation (long-term)
1 Relocatable home park 1 $22,200.00 for each relocatable dwelling site for 2 or less bedrooms2 $31,080.00 for each relocatable dwelling site for 3 or more bedrooms 2 Community residence3 Retirement facility4 Rooming accommodation 1 $22,200.00 for each suite with 2 or less bedrooms2 $31,080.00 for each suite with 3 or more bedrooms3 $22,200.00 for each bedroom that is not part of a suitePlaces of assembly
1 Club2 Community use3 Function facility4 Funeral parlour5 Place of worship 1 $77.75 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterCommercial (bulk goods)
1 Agricultural supplies store2 Bulk landscape supplies3 Garden centre4 Hardware and trade supplies5 Outdoor sales6 Showroom 1 $155.40 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterCommercial (retail)
1 Adult store2 Food and drink outlet3 Service industry4 Service station5 Shop6 Shopping centre 1 $199.80 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterCommercial (office)
1 Office2 Sales office 1 $155.40 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterEducational facility
1 Childcare centre2 Community care centre3 Educational establishment 1 $155.40 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterEntertainment
1 Hotel2 Nightclub entertainment facility3 Theatre4 Resort complex 1 $221.95 for each square metre of gross floor area, other than areas for providing accommodation2 $11.10 for each square metre impervious to stormwaterIndoor sport and recreation
1 Indoor sport and recreation 1 $221.95 for each square metre of gross floor area, other than court areas2 $22.15 for each square metre of gross floor area that is a court area3 $11.10 for each square metre impervious to stormwaterHigh impact industry or special industry
1 High impact industry2 Special industry 1 $77.75 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterOther industry
1 Low impact industry2 Medium impact industry3 Research and technology industry4 Rural industry5 Warehouse6 Marine industry 1 $55.50 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterHigh impact rural
1 Cultivating, in a confined area, aquatic animals or plants for sale2 Intensive animal industry3 Intensive horticulture4 Wholesale nursery5 Winery 1 $22.15 for each square metre of gross floor areaLow impact rural
1 Animal husbandry2 Cropping3 Permanent plantation4 Wind farmNil
Essential services
1 Correctional facility2 Emergency services3 Health care service4 Hospital5 Residential care facility6 Veterinary service 1 $155.40 for each square metre of gross floor area2 $11.10 for each square metre impervious to stormwaterMinor uses
1 Advertising device2 Cemetery3 Home-based business4 Landing5 Market6 Outdoor lighting7 Park8 Roadside stall9 Telecommunications facility10 Temporary useNil
Other uses
1 Air service2 Animal keeping3 Car park4 Crematorium5 Extractive industry6 Major sport, recreation and entertainment facility7 Motor sport facility8 Outdoor sport and recreation9 Port service10 Tourist attraction11 Utility installation12 Workforce accommodation13 Any other use not listed in column 1, including a use that is unknownThe prescribed amount for another similar use listed in column 1 (other than in this row) that the local government or distributor-retailer decides to apply to the use
16Amendment of sch 17 (Tribunal fees)
Schedule 17, column 3, heading, ‘$’—
omit, insert—Fee units
Part 3 Amendment of Regional Planning Interests Regulation 2014
This part amends the Regional Planning Interests Regulation 2014.
18Amendment of s 16 (Mitigation value)
Section 16(1)(a) to (e)—
omit, insert—(a)for land in the following sub-zones in the Western Cropping zone—(i)Balonne—5,752 fee units;(ii)Central Highlands Isaac—5,576 fee units;(iii)Goondiwindi—6,162 fee units;(iv)Maranoa—6,749 fee units;(v)Western Downs—7,042 fee units;(b)for land in the Eastern Darling Downs zone—8,803 fee units;(c)for land in the following sub-zones in the Coastal Queensland zone—(i)Burdekin—13,205 fee units;(ii)Burnett North and South—13,205 fee units;(iii)Mackay Whitsunday—13,205 fee units;(iv)Wide Bay Bundaberg—13,205 fee units;(v)Central Queensland Coast—17,604 fee units;(vi)South East Queensland—29,343 fee units;(d)for land in the Granite Belt zone—16,431 fee units;(e)for land in the Wet Tropics zone—23,475 fee units.
After section 19—
insert—19ARounding of amounts expressed as numbers of fee units
(1)This section applies for working out the amount of a fee expressed in this regulation as a number of fee units.(2)For the purpose of the Acts Interpretation Act 1954, section 48C(3), the amount is to be rounded to the nearest dollar (rounding one-half upwards).If a fee were 3500 fee units and the value of a fee unit were $1.015, the number of dollars obtained by multiplying 3500 by $1.015 would be $3,552.50. Because $3,552.50 is halfway between $3,552 and $3,553, it is rounded upwards, so the amount of the fee would be $3,553.
20Amendment of sch 4 (Assessment application fees)
(1)Schedule 4, part 1, section 1, heading, ‘sch 4’—
omit, insert—schedule
(2)Schedule 4, parts 2 to 5, column 2, heading, after ‘Fee’—
insert—units
(3)Schedule 4, parts 2 to 5, column 2, heading, ‘$’—
omit.